| ITC-ResComp Tasks & Projects To Do: 07/26/99 |
||
|---|---|---|
| Project | Owner/Date | Comments |
| 1. Non-IBM Research Computing Engines (both Sun and SGI) | Hamp/Tim T. | Orange cluster and SGI cluster (Unix
lab) names will be orange#.unixlab and teal#.unixlab
respectively.
|
| 2. ADSM/HSM (archive) (hardware and software). | Hamp
Tim T. |
IBM removed ADSM from Consortium software; waffling about cost.
won't be off-list until 9/1999.
Transfer will be user by user. Target date: Fall, 1999 Spring,1999: Hamp has started moving ITC & "public" data into HSM. Coordinate archive (ADSM) group. Contact each user and say we will move you-can't use archive during transfer. Tim T.: Draft space use policy, circulate to group, then Tim S. can take to directors for approval. By Sept. 15 |
| 3. "Research News" | Tim T. | ResComp group writing for a Fall edition |
| 4. Software Installations and Updates | . | . |
| 5. NPACI (National Partnership for Advanced Computational Infrastructure) and SUR Grant | Tim S. Tom |
Legion still has a "few" bugs. |
| 6. SP | Tom Ed Tim S. |
Will get back on checkpoint issue. Ed studied class usage and announcing new submit classes; upgrade of nodes to 160 Mhz processors; 8 nodes dedicated to parallel jobs. http://jm.acs.Virginia.EDU/research/docs/SP_new.html 2 new switches and adapters for all nodes on order. Will require system downtime when installed by IBM |
| 7. ITC Research Advisory Committees | Tim S., Tom S.,
Tim T. |
UCIT sub-committee re-drafting proposal for research computing to
take into account ACAC sub-comm. comments.
ACAC has res. computing subcommittee headed by Steve Stern. Discussing long & short term solutions. 8/99: Preliminary Technology Proposal to "Create an Advanced Computational Support Center for Science and Engineering" by Tim Sigmon |
| 8. Research Computing Support Center | Dawn Adelsberger-Mangan/Tim T. | Space in 244Wilson Hall, old NMC space,
plus two staff offices and 3rd located in Center. Try to develop current
Unix Lab in Small Hall as satellite center. Hire, train, and supervise consultants
there as part of RCSC. Projected move date, late September, Grand Opening: Fall Break, Oct 14. |
| 9. Department Outreach | Tim T. | From ACAC res. computing subcommittee: need to try again-figure out better way to reach faculty - faculty meetings? Surveys? |
| 10. Y2K Issues | Jim | We have Y2K plan for unix - it's under control. UVA Year 2000 Task Force Jeff Sponaugle chairing research issues |
Go to: ITC Research Computing Committee Home Page
|| Go to: most recent ITC-ResComp DONE table
by Tim F.J. Tolson